Appendix G PRM Rules
            
          
        
The “Create ASHRAE 90.1-2019 PRM Model” measure provides a detailed implementation of the rules of the Appendix G Performance Rating Method. Below are some of the key changes that are applied by the tool when creating the Baseline and Proposed model:
Rules for Baseline Model
- Apply baseline envelope rules
- Space conditioning type
 
- Constructions
 
- Insulation levels
 
- Window-to-wall ratio
 
- Skylight-to-roof ratio
 
- Infiltration
 
 
- Apply baseline lighting rules
- Lighting power
 
- Lighting occupancy sensor control
 
 
- Determine and create baseline HVAC systems
- Remove user model HVAC
 
- Determine baseline HVAC based on building type and Appendix G rules
 
- Create new baseline HVAC systems
 
- Apply special rules for computer rooms and laboratories
 
 
- Size HVAC systems
- Apply HVAC efficiencies
 
- Apply fan power adjustments
 
- Apply baseline HVAC controls
 
 
- Rotate building model through cardinal directions
 
- Check for unmet load hours and rectify, if needed
 
- Handle additional compliance data
- Multiple building types
 
- Plug load measures
 
- Elevators
 
- Exterior lighting
 
- Interior lighting exceptions
 
- Number of systems per zone
 
 
Rules for Proposed Model
- Apply proposed envelope rules
 
- Apply proposed lighting rules
- Residential lighting power
 
 
- Remove pipe losses for SWH
 
- Adjust computer room equipment schedules